This run-of-the-river power plant with an installed capacity of 1000 MW (250×4, with a reserved extension capacity of another 1000 MW) having the generation capacity of 3700 million KWh of annual energy was entirely excavated and completed by Tablieh as part of it’s subcontract for the Korean-Japanese Joint Venture, Daelim-Sato JV. Tablieh was acting as the leading member of the Tablieh-Perlite JV. Powerhouse Cavern: SF6 Shaft & Bus Gallery:
Size: 155m (L) ×30m (W) ×49m (H)
4 Units of Francis type turbine generator(250MW)
Transformer Cavern:
Size: 110 m (L) ×14 m (W) ×23 m (H)
Pressure Shafts , Upper & Lower Vertical Bends:
Size: L=558 m Dia=9 m
Tailrace Tunnels:
Size: L=760 m Dia=11 m
Vent Shaft & Gallery:
Shaft size: H=121 m Dia=5.6 m
Gallery size: L=74 m Dia=5.6 m
Shaft: H=98 m Dia=6 m
Gallery: L=70 m Dia=6 m
Power Intake
Size: L= 120 m W= 42 m H= 45.5 m
Power Outlet
Size: L= 162 m W=34.5 m H= 48.5 m
Location | Khuzestan Province |
Client | Iran Water & Power Resources Development Co. |
Consultant | Nippon Koei (Japan) -Moshanir- Lahmeyer International (Germany) |
Main contractor | Daelim-Sato Joint Venture |
Tunnel | 4.7 km |
Excavation | 450,000 m3 |
Concrete | 139,500 m3 |