The 3,000 mmscfd capacity South Pars Gas Development Phases 6,7 & 8 onshore plant, owned by Pars Oil & Gas Company (POGC) was constructed in the Southern port city of Assaluyeh. The total six units will produce 112,200 barrel per day of condensate, 2,850 million cubic feet of dry and
sour methane gas per day, and 1,995 ton per day of propane & 1,145 ton per day of butane. The gas will be used for injecting oil wells in the Agha-Jari oil field. Tablieh, in two separate subcontracts from the project EPC Contractor (The Joint Venture of Toyo & JGC of Japan, Daelim of Korea and IDRO of Iran – TIJD), was not only in charge of
a major portion of the Project civil works (including concrete pipe racks, equipment foundations, ditches, cable trenches, etc.), but was also responsible for production of close to 300,000 cubic meters of concrete for the entire project.
Location | Assaluyeh, Bushehr Province |
General contractor | Petropars Ltd |
EPC Consultant | Toyo, IDRO, JGC, Daelim (TIJD) |
Owner | Pars Oil & Gas Co. (POGC) |
Excavation | 325,940 m3 |
Backfilling | 90,942 m3 |
Reinforcement | 5,060 Ton |
Wire Mesh | 519 Tons |
Concrete Production | 293,000m3 |
Concrete Placed | 34,000 m3 |